1. kn filter, plugs, and plug wires (done)
2. upjet the carb (done)
3. 130 size rear tyre (pending)
4. dual front discs ( pending)
5. mechanical abs for rear (pending)
6. rebore the engine to 250 cc (pending)
7. forged pistons, cam etc (pending)
8. porting and polishing,valve tuning (pending)
9. HID low beam (pending)
10.sprocketing (Doing)
I believe these alterations will make my p220, unique.