Snapshots of my Rebuild Shopping



Stripping Down the bike & getting the bike ready for a rebuild.

getting the bottom end of the bike Ready was the key to the rebuild.Bike Has a New Crank,New 5 speed bore,New Clutch Bell & a new 5 speed Gearbox (its not a case of 4 speed gearbox converted to a 5 speed one
). Special & a Big Thank You to Ron & Teji of RDD for the head Mod.




Got a 5 speed Carb for the bike


i have always been a Yamaha Factory Finish Lover never believed in shady Repaint & Chrome Jobs for cosmetics parts,all the cosmetic parts is new & not Repainted.New Parts Include 5 Speed Engine Side Casings,Chain Casing,a New Lock Set & the list goes on
.Bike a Has new Chrome Silencer & Crashguard 
Ready for lease of life


Special thanks to Pradeep(pyscho98) in this rebuild.as of now will Run in the bike & latter add some more goodies like a Good CDI & a lighting Kit to make the Rebuild a Complete Package